The Hungry Giant Solution

The Hungry Giant is the leading OE provider of waste food recycling machines with feature benefits that outclass the field.


image description
image description
image description

When these "dehydration" machines were first introduced into N. America, most for food service operators elected to purchase machines that were rated to process 250lbs within a 15~18 hour timeframe. Some customers would purchase two of these machines alternating the start/empty cycles to enable them to process the volume of food waste produced at their sites. Larger food service facilities that had created 800~1,200lbs per day of food waste or more really had no viable economic solution with a reasonable ROI.

Resource Environmental Solutions in Sydney, Australia has designed and engineered the Hungry Giant food waste dehydration systems that offer all food service sites an economic solution to getting rid of their food waste on site. These machines utilize programmable logic controllers that measure the amount of moisture as it is being evaporated during the process to power down the machine as compared to machines that operate on timers only. This technology provides a much faster and more economical solution to processing food waste saving electricity and enabling customers to process up to 50% more throughput.

Today, the Hungry Giant is the leading OE provider of waste food waste recycling machines with feature benefits found in no other dehydration machines.

READ MORE: The Hungry Giant Technology